This paper deals with the production scheduling problem with customer-driven demand substitution. We consider a manufacturing system in a make-to-stock environment which is potentially able to produce a large variety of product options (the so-called long-term product assortment) but, for reasons of capacity and operative limitations, only a subset of those options can be available in stock at the same time (the so-called short-term product assortment). In such a context, typical of fields where high-variety strategies are applied, the first-choice option of the customer could be unavailable at a certain instant of time. In that case, if production is planned by taking demand substitution issues into consideration, other options which are good substitutes will be available, thus increasing the probability that the customer chooses to substitute. The paper proposes two mixed-integer linear programming models (for both the lost sale case and the backorder case) for optimising the production schedule by jointly considering (i) capacity and production constraints, and costs on one hand, (ii) and demand substitution issues on the other hand. An extensive experimental analysis has allowed us to evaluate the models’ behaviour in a variety of operative scenarios and to draw some concluding remarks.
Optimal production scheduling with customer-driven demand substitution / Zeppetella, Luca; Gebennini, Elisa; Grassi, Andrea; Rimini, Bianca. - In: INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. - ISSN 0020-7543. - 55:6(2017), pp. 1692-1706. [10.1080/00207543.2016.1223895]
Optimal production scheduling with customer-driven demand substitution
ZEPPETELLA, LUCA;GEBENNINI, Elisa;GRASSI, Andrea;RIMINI, Bianca
2017
Abstract
This paper deals with the production scheduling problem with customer-driven demand substitution. We consider a manufacturing system in a make-to-stock environment which is potentially able to produce a large variety of product options (the so-called long-term product assortment) but, for reasons of capacity and operative limitations, only a subset of those options can be available in stock at the same time (the so-called short-term product assortment). In such a context, typical of fields where high-variety strategies are applied, the first-choice option of the customer could be unavailable at a certain instant of time. In that case, if production is planned by taking demand substitution issues into consideration, other options which are good substitutes will be available, thus increasing the probability that the customer chooses to substitute. The paper proposes two mixed-integer linear programming models (for both the lost sale case and the backorder case) for optimising the production schedule by jointly considering (i) capacity and production constraints, and costs on one hand, (ii) and demand substitution issues on the other hand. An extensive experimental analysis has allowed us to evaluate the models’ behaviour in a variety of operative scenarios and to draw some concluding remarks.File | Dimensione | Formato | |
---|---|---|---|
Optimal production scheduling with customer driven demand substitution.pdf
Accesso riservato
Descrizione: Full text
Tipologia:
Versione pubblicata dall'editore
Dimensione
514.11 kB
Formato
Adobe PDF
|
514.11 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Unimore IJPR 2015 submission (1).pdf
Open access
Tipologia:
Versione originale dell'autore proposta per la pubblicazione
Dimensione
431.28 kB
Formato
Adobe PDF
|
431.28 kB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris