Assembly lines managed by means of lean production philosophy are usually characterized by workstations with inline stock areas, supplied by means of items contained in a larger supermarket zone. Furthermore, inline components necessities are usually showed by means of the use of kanbans. In this work, the number of kanbans and the number of carriers serving the line are computed by means of Erlang-C approach, in order to minimize a total cost function obtained as the sum of an estimation of cost of inline stock and of cost of refilling operations. Specifically, the Erlang-C approach is adopted since assures fast re-design of the system when variations in input data occur. Finally, a real-life case study in a company manufacturing items for the automotive market field is presented in order to highlight the approach potentialities when alternative scenarios are studied.

ALTERNATIVE REFILLING POLICIES FOR AN ASSEMBLY LINE MANAGED BY KANBANS / Gamberini, Rita; Meli, M.; Galloni, Luca; Rimini, Bianca; Lolli, Francesco. - ELETTRONICO. - 46:9(2013), pp. 1914-1919. (Intervento presentato al convegno 7th IFAC Conference on Manufacturing Modelling, Management, and Control, MIM 2013 tenutosi a Saint Petersburg, rus nel 19th - 21st June) [10.3182/20130619-3-RU-3018.00481].

ALTERNATIVE REFILLING POLICIES FOR AN ASSEMBLY LINE MANAGED BY KANBANS

GAMBERINI, Rita;GALLONI, Luca;RIMINI, Bianca;LOLLI, Francesco
2013

Abstract

Assembly lines managed by means of lean production philosophy are usually characterized by workstations with inline stock areas, supplied by means of items contained in a larger supermarket zone. Furthermore, inline components necessities are usually showed by means of the use of kanbans. In this work, the number of kanbans and the number of carriers serving the line are computed by means of Erlang-C approach, in order to minimize a total cost function obtained as the sum of an estimation of cost of inline stock and of cost of refilling operations. Specifically, the Erlang-C approach is adopted since assures fast re-design of the system when variations in input data occur. Finally, a real-life case study in a company manufacturing items for the automotive market field is presented in order to highlight the approach potentialities when alternative scenarios are studied.
2013
7th IFAC Conference on Manufacturing Modelling, Management, and Control, MIM 2013
Saint Petersburg, rus
19th - 21st June
46
1914
1919
Gamberini, Rita; Meli, M.; Galloni, Luca; Rimini, Bianca; Lolli, Francesco
ALTERNATIVE REFILLING POLICIES FOR AN ASSEMBLY LINE MANAGED BY KANBANS / Gamberini, Rita; Meli, M.; Galloni, Luca; Rimini, Bianca; Lolli, Francesco. - ELETTRONICO. - 46:9(2013), pp. 1914-1919. (Intervento presentato al convegno 7th IFAC Conference on Manufacturing Modelling, Management, and Control, MIM 2013 tenutosi a Saint Petersburg, rus nel 19th - 21st June) [10.3182/20130619-3-RU-3018.00481].
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/975897
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? ND
social impact