MAAT project is a large airship project presented to the last European 7 Framework Program Transport including Aeronautics 2011 deadline. MAAT project is an airship based cruiser-feeder transport system. This paper analyzes the criticalities of the project and the way to upfront these problems which have different natures and possible solutions. Most important criticalities are analyzed both on a methodological point of view and on a direct point of view. Enhanced design methodologies are analyzed in depth to analyze problems, upgrade the project design status continuously and to examine different design options and solutions. An innovative design method has been defined to avoid that problems can produce show stoppers and minimize time delays during project definition.
MAAT Cruiser/Feeder Project: Criticalities and Solution Guidelines / Dumas, Antonio; Madonia, Mauro; Giuliani, Ilaria; Trancossi, Michele. - In: SAE TECHNICAL PAPER. - ISSN 0148-7191. - ELETTRONICO. - 2011-01-2784:(2011), pp. 1-14. (Intervento presentato al convegno SAE 2011 AeroTech Congress and Exhibition, AEROTECH 2011 tenutosi a Toulouse, fra nel 2011) [10.4271/2011-01-2784].
MAAT Cruiser/Feeder Project: Criticalities and Solution Guidelines
DUMAS, Antonio;MADONIA, MAURO;GIULIANI, Ilaria;TRANCOSSI, MICHELE
2011
Abstract
MAAT project is a large airship project presented to the last European 7 Framework Program Transport including Aeronautics 2011 deadline. MAAT project is an airship based cruiser-feeder transport system. This paper analyzes the criticalities of the project and the way to upfront these problems which have different natures and possible solutions. Most important criticalities are analyzed both on a methodological point of view and on a direct point of view. Enhanced design methodologies are analyzed in depth to analyze problems, upgrade the project design status continuously and to examine different design options and solutions. An innovative design method has been defined to avoid that problems can produce show stoppers and minimize time delays during project definition.File | Dimensione | Formato | |
---|---|---|---|
2011-01-2784.pdf
Accesso riservato
Tipologia:
Versione dell'autore revisionata e accettata per la pubblicazione
Dimensione
8.71 MB
Formato
Adobe PDF
|
8.71 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Pubblicazioni consigliate
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris