This study proposes the energy conversion of vine prunings to supply energy to local wineries, with a focus on the Riunite & CIV branch winery located in Carpi (Modena, Italy), exploring the possibility of generating both electricity and heat through biomass gasification. A Matlab-Simulink model is used to evaluate the energy savings that can be achieved when an energy storage system is coupled with the combined heat and power generation system. Within this context, the results showed that it is possible to save approximate to 60% of the thermal energy demanded by the winery. However, the economic viability of the project is hindered by high investment and operation costs. DPB is strongly affected by the cost of biomass and the energy prices, resulting in a profitable investment for electricity prices higher than 0.30(sic)> 0.57 euro/kWh according to the different scenarios investigated.
A technical-economic analysis of integrating vine prunings energy conversion systems for CHP production in local wineries / Morselli, N.; Puglia, M.; Capozzolo, G.; Allesina, G.; Muscio, A.; Tartarini, P.; Pedrazzi, S.. - In: ENERGY EFFICIENCY. - ISSN 1570-646X. - 17:4(2024), pp. 1-19. [10.1007/s12053-024-10214-z]
A technical-economic analysis of integrating vine prunings energy conversion systems for CHP production in local wineries
Morselli N.;Puglia M.;Capozzolo G.;Allesina G.;Muscio A.;Tartarini P.;Pedrazzi S.
2024
Abstract
This study proposes the energy conversion of vine prunings to supply energy to local wineries, with a focus on the Riunite & CIV branch winery located in Carpi (Modena, Italy), exploring the possibility of generating both electricity and heat through biomass gasification. A Matlab-Simulink model is used to evaluate the energy savings that can be achieved when an energy storage system is coupled with the combined heat and power generation system. Within this context, the results showed that it is possible to save approximate to 60% of the thermal energy demanded by the winery. However, the economic viability of the project is hindered by high investment and operation costs. DPB is strongly affected by the cost of biomass and the energy prices, resulting in a profitable investment for electricity prices higher than 0.30(sic)> 0.57 euro/kWh according to the different scenarios investigated.File | Dimensione | Formato | |
---|---|---|---|
s12053-024-10214-z-1.pdf
Open access
Tipologia:
Versione pubblicata dall'editore
Dimensione
2.43 MB
Formato
Adobe PDF
|
2.43 MB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris