In a family of items under coordinated inventory replenishments, some products may be replenished at the same time, which in turn implies that some lead time components and costs may be shared among them. This paper investigates this aspect in the context of the joint replenishment problem under the class of cyclic policies, assuming random demands and controllable lead times, and imposing a fill rate constraint for each item.& COPY; 2023 Elsevier B.V. All rights reserved.
Stochastic joint replenishment problem under a fill rate constraint with controllable lead times and shared cost allocation / Castellano, D.; Santillo, L. C.. - In: OPERATIONS RESEARCH LETTERS. - ISSN 0167-6377. - 51:4(2023), pp. 385-392. [10.1016/j.orl.2023.05.006]
Stochastic joint replenishment problem under a fill rate constraint with controllable lead times and shared cost allocation
Castellano D.
;
2023
Abstract
In a family of items under coordinated inventory replenishments, some products may be replenished at the same time, which in turn implies that some lead time components and costs may be shared among them. This paper investigates this aspect in the context of the joint replenishment problem under the class of cyclic policies, assuming random demands and controllable lead times, and imposing a fill rate constraint for each item.& COPY; 2023 Elsevier B.V. All rights reserved.Pubblicazioni consigliate
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris