This research analyses multiple anthropogenic pressures in the Bernesga River, a gravel-bed river in Northwestern Iberian Peninsula. Among the causes of river incision in Bernesga River are extensive mining during the second half of the twentieth century, a 100 years-long history of channelization and river training starting around 1900, and to a lesser extent, land-use changes in the basin. As a result of these impacts, reach-averaged incision exceeds 8.5 m. Severe incision occurred simultaneously with a dramatic change in channel pattern: from 450 m-wide braided morphology around middle of the twentieth century to a narrow single-thread 40 m wide) channel in 2017. Quaternary alluvial deposits have been mostly depleted exposing the underlying bedrock. Unlike other rivers, bedrock outcrops have not stopped incision. Extremely narrow channels ( 12 m wide) have developed and incised at rates of 0.11 m/yr into bedrock materials, headcuts have formed on bedrock deposits and have rapidly retreated (at 33 m/yr) and the channel has incised forming adverse slopes under the presence of bed sills. Cause-effect relationships of cumulative impacts have been established between the recent evolutionary trajectory of the Bernesga River and multiple and simultaneous anthropogenic pressures.
Massive incision and outcropping of bedrock in a former braided river attributed to mining and training / Ferrer-Boix, Carles; Scorpio, Vittoria; Martín-Vide, Juan P.; Núñez-González, Francisco; Mora, Daniel. - In: GEOMORPHOLOGY. - ISSN 0169-555X. - 436:(2023), pp. 1-15. [10.1016/j.geomorph.2023.108774]
Massive incision and outcropping of bedrock in a former braided river attributed to mining and training
Vittoria Scorpio;
2023
Abstract
This research analyses multiple anthropogenic pressures in the Bernesga River, a gravel-bed river in Northwestern Iberian Peninsula. Among the causes of river incision in Bernesga River are extensive mining during the second half of the twentieth century, a 100 years-long history of channelization and river training starting around 1900, and to a lesser extent, land-use changes in the basin. As a result of these impacts, reach-averaged incision exceeds 8.5 m. Severe incision occurred simultaneously with a dramatic change in channel pattern: from 450 m-wide braided morphology around middle of the twentieth century to a narrow single-thread 40 m wide) channel in 2017. Quaternary alluvial deposits have been mostly depleted exposing the underlying bedrock. Unlike other rivers, bedrock outcrops have not stopped incision. Extremely narrow channels ( 12 m wide) have developed and incised at rates of 0.11 m/yr into bedrock materials, headcuts have formed on bedrock deposits and have rapidly retreated (at 33 m/yr) and the channel has incised forming adverse slopes under the presence of bed sills. Cause-effect relationships of cumulative impacts have been established between the recent evolutionary trajectory of the Bernesga River and multiple and simultaneous anthropogenic pressures.File | Dimensione | Formato | |
---|---|---|---|
2023_Ferrer_boix et al- GEOMORPHOLOGY_1-s2.0-S0169555X23001940-main.pdf
Accesso riservato
Tipologia:
Versione pubblicata dall'editore
Dimensione
21.12 MB
Formato
Adobe PDF
|
21.12 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
Pubblicazioni consigliate
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris