The purpose of this study is to propose and test a tree-like structure for assessing the operational performance of an eco-industrial park composed of a managerial, focal company, and five manufacturing companies that exchange, generate, or reuse energy, waste, and by-products from different sources. The top term is the EIP operational overall performance, supported by indicators retrieved from the literature and organized in four constructs: (i) internal relationships; (ii) external relations; (iii) energy recovery; and (iv) materials recovery. The first construct encompasses relationships between companies, leadership, mutual trust and technological exchange, communication, and integrated information systems. The second encompasses relations with government, stakeholder communication, compliance, and social responsibility. The third encompasses the reuse of biomass, refuse-derived fuels, heat, fluids (water, gases, steam), and the energy efficiency of facilities. The last encompasses reuse of waste, reuse of byproducts, efficiency in the logistical process, and efficiency in the manufacturing process. The structure embraces the three main pillars of sustainability, since the first and second constructs include social issues, whereas the third and fourth include economic and environmental ones. The research method is qualitative modeling. Managers employed a Likert scale of agreement [0 = strongly disagree ... 1 = strongly agree] to evaluate the importance and performance of indicators. The importance depends on the influence on the construct and the influence that the construct exerts on the top term. The performance depends on the contribution of the indicator to the overall operational result of the EIP. Results show that there is no need to reallocate or replace strategic resources among the constructs, but also show that the overall performance is only 59 % of the maximum possible. Two constructs, internal relationships, and energy recovery require control actions and further managerial improvement.

Performance Assessment of an Eco-Industrial Park: a Strategic Tool to Help Recovering Energy and Industrial Waste / Maurer Koch, Cristiane; Tomasin, Leandro; Lolli, Francesco; Butturi, MARIA ANGELA; Afonso Sellitto, Miguel. - In: CHEMICAL ENGINEERING TRANSACTIONS. - ISSN 2283-9216. - 91:(2022), pp. 481-486. [10.3303/CET2291081]

Performance Assessment of an Eco-Industrial Park: a Strategic Tool to Help Recovering Energy and Industrial Waste

Francesco Lolli;Maria Angela Butturi;
2022

Abstract

The purpose of this study is to propose and test a tree-like structure for assessing the operational performance of an eco-industrial park composed of a managerial, focal company, and five manufacturing companies that exchange, generate, or reuse energy, waste, and by-products from different sources. The top term is the EIP operational overall performance, supported by indicators retrieved from the literature and organized in four constructs: (i) internal relationships; (ii) external relations; (iii) energy recovery; and (iv) materials recovery. The first construct encompasses relationships between companies, leadership, mutual trust and technological exchange, communication, and integrated information systems. The second encompasses relations with government, stakeholder communication, compliance, and social responsibility. The third encompasses the reuse of biomass, refuse-derived fuels, heat, fluids (water, gases, steam), and the energy efficiency of facilities. The last encompasses reuse of waste, reuse of byproducts, efficiency in the logistical process, and efficiency in the manufacturing process. The structure embraces the three main pillars of sustainability, since the first and second constructs include social issues, whereas the third and fourth include economic and environmental ones. The research method is qualitative modeling. Managers employed a Likert scale of agreement [0 = strongly disagree ... 1 = strongly agree] to evaluate the importance and performance of indicators. The importance depends on the influence on the construct and the influence that the construct exerts on the top term. The performance depends on the contribution of the indicator to the overall operational result of the EIP. Results show that there is no need to reallocate or replace strategic resources among the constructs, but also show that the overall performance is only 59 % of the maximum possible. Two constructs, internal relationships, and energy recovery require control actions and further managerial improvement.
2022
91
481
486
Performance Assessment of an Eco-Industrial Park: a Strategic Tool to Help Recovering Energy and Industrial Waste / Maurer Koch, Cristiane; Tomasin, Leandro; Lolli, Francesco; Butturi, MARIA ANGELA; Afonso Sellitto, Miguel. - In: CHEMICAL ENGINEERING TRANSACTIONS. - ISSN 2283-9216. - 91:(2022), pp. 481-486. [10.3303/CET2291081]
Maurer Koch, Cristiane; Tomasin, Leandro; Lolli, Francesco; Butturi, MARIA ANGELA; Afonso Sellitto, Miguel
File in questo prodotto:
File Dimensione Formato  
081.pdf

Accesso riservato

Tipologia: Versione pubblicata dall'editore
Dimensione 922.49 kB
Formato Adobe PDF
922.49 kB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/1284144
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
social impact