The average internal rate of return (AIRR) fixes many deficiencies associated with the traditional internal rate of return (IRR), including apparent inconsistency with net present value (NPV). The AIRR approach breaks down project NPV into scale (the capital invested) and economic efficiency (the AIRR), and maintains NPV consistency for accept/reject decisions. Here we examine extensions of the AIRR to risky capital asset projects, a domain where the IRR appears intractable. We show that one can uniquely break down a risky NPV into a risk-sensitive project scale and a risk-sensitive extended AIRR, representing risky project efficiency, so that consistency with NPV for accept/reject decisions is maintained in the certainty-equivalent sense, in direct analogy to the deterministic case. This novel breakdown gives managerial insight by helping determine a risky project’s locus of uncertainty, be it the project scale, or economic efficiency, or both. In this way, risky features of competing projects can be explored in more detail, leading to insights substantiating the NPV ranking. We also show that under risk neutrality, the expected AIRR is equal to the AIRR of the expected cash flow, a property that notoriously fails for the stochastic IRR.

Average internal rate of return for risky projects / Hazen, G.; Magni, C. A.. - In: THE ENGINEERING ECONOMIST. - ISSN 0013-791X. - 66:2(2021), pp. 90-120. [10.1080/0013791X.2021.1894284]

Average internal rate of return for risky projects

Magni C. A.
2021

Abstract

The average internal rate of return (AIRR) fixes many deficiencies associated with the traditional internal rate of return (IRR), including apparent inconsistency with net present value (NPV). The AIRR approach breaks down project NPV into scale (the capital invested) and economic efficiency (the AIRR), and maintains NPV consistency for accept/reject decisions. Here we examine extensions of the AIRR to risky capital asset projects, a domain where the IRR appears intractable. We show that one can uniquely break down a risky NPV into a risk-sensitive project scale and a risk-sensitive extended AIRR, representing risky project efficiency, so that consistency with NPV for accept/reject decisions is maintained in the certainty-equivalent sense, in direct analogy to the deterministic case. This novel breakdown gives managerial insight by helping determine a risky project’s locus of uncertainty, be it the project scale, or economic efficiency, or both. In this way, risky features of competing projects can be explored in more detail, leading to insights substantiating the NPV ranking. We also show that under risk neutrality, the expected AIRR is equal to the AIRR of the expected cash flow, a property that notoriously fails for the stochastic IRR.
2021
66
2
90
120
Average internal rate of return for risky projects / Hazen, G.; Magni, C. A.. - In: THE ENGINEERING ECONOMIST. - ISSN 0013-791X. - 66:2(2021), pp. 90-120. [10.1080/0013791X.2021.1894284]
Hazen, G.; Magni, C. A.
File in questo prodotto:
File Dimensione Formato  
TEE 2021 AIRR for risky projects.pdf

Accesso riservato

Tipologia: Versione pubblicata dall'editore
Dimensione 3.31 MB
Formato Adobe PDF
3.31 MB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/1266527
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 7
  • ???jsp.display-item.citation.isi??? 5
social impact