This paper describes a case study on lean manufacturing implementation to the valve pre-assembly area of a bottling lines production plant in Italy, and it is a pilot project for a wider lean implementation in the whole organization, with the aim of rationalizing all processes and improving efficiency. The case study was deeply described, justifying the implementation of lean in an area of an Engineer-To-Order (ETO) company. Despite the context, lean led to significant improvement in throughput rates (+50%), average lead times (-80%) and products quality. Also, the pilot assembly plant greatly decreased the occupied space on the shop floor. For all these reasons, lean is also confirmed as a strategic choice in ETO companies, where this philosophy can lead to a new way of thinking and working towards successful and long-lasting results.

Lean manufacturing in the valve pre-assembly area of a bottling lines production plant: An Italian case study / Bertolini, M.; Romagnoli, G.. - (2013), pp. 93-100. (Intervento presentato al convegno 5th International Conference on Industrial Engineering and System Management, - IESM 2013 tenutosi a Rabat, Morocco nel 28-30 Ottobre 2013).

Lean manufacturing in the valve pre-assembly area of a bottling lines production plant: An Italian case study

Bertolini M.;
2013

Abstract

This paper describes a case study on lean manufacturing implementation to the valve pre-assembly area of a bottling lines production plant in Italy, and it is a pilot project for a wider lean implementation in the whole organization, with the aim of rationalizing all processes and improving efficiency. The case study was deeply described, justifying the implementation of lean in an area of an Engineer-To-Order (ETO) company. Despite the context, lean led to significant improvement in throughput rates (+50%), average lead times (-80%) and products quality. Also, the pilot assembly plant greatly decreased the occupied space on the shop floor. For all these reasons, lean is also confirmed as a strategic choice in ETO companies, where this philosophy can lead to a new way of thinking and working towards successful and long-lasting results.
2013
5th International Conference on Industrial Engineering and System Management, - IESM 2013
Rabat, Morocco
28-30 Ottobre 2013
93
100
Bertolini, M.; Romagnoli, G.
Lean manufacturing in the valve pre-assembly area of a bottling lines production plant: An Italian case study / Bertolini, M.; Romagnoli, G.. - (2013), pp. 93-100. (Intervento presentato al convegno 5th International Conference on Industrial Engineering and System Management, - IESM 2013 tenutosi a Rabat, Morocco nel 28-30 Ottobre 2013).
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/1188599
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 8
  • ???jsp.display-item.citation.isi??? 9
social impact