This study proposes a multi-objective linear programming model for solving the multi-product aggregate production planning (APP) decision problem for Topline Co., Ltd. in Thailand. The model attempts to minimise total production and work force costs and carrying inventory costs to bring a planning framework for the industrial resources management under complex information environment. The proposed model yields an efficient compromise solution and the overall levels of decision making satisfaction with the multiple objectives via the fuzzy programming using the elevator kinematics optimisation (EKO) algorithm including its hybridisations of harmony search and bee algorithms. The comparisons are made for two different levels of inventory. It can be concluded that the EKO is slightly more effective than the other hybrid approaches in terms of quality of solutions. However, there is no difference in required computation time. The basic idea is to produce reliable solution in search space with the random external command in escaping from local trap during searching for a better solution. Numerical results demonstrate the robustness and effectiveness of the developed EKO method.

An Elevator Kinematics Optimisation Method for Aggregate Production Planning Based on Fuzzy MOLP Model / Aungkulanon, Pasura; Luangpaiboon, Pongchanun; Montemanni, Roberto. - In: INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND ROBOTICS RESEARCH. - ISSN 2278-0149. - 7:4(2018), pp. 22-427. [10.18178/ijmerr.7.4.422-427]

An Elevator Kinematics Optimisation Method for Aggregate Production Planning Based on Fuzzy MOLP Model

Montemanni Roberto
2018

Abstract

This study proposes a multi-objective linear programming model for solving the multi-product aggregate production planning (APP) decision problem for Topline Co., Ltd. in Thailand. The model attempts to minimise total production and work force costs and carrying inventory costs to bring a planning framework for the industrial resources management under complex information environment. The proposed model yields an efficient compromise solution and the overall levels of decision making satisfaction with the multiple objectives via the fuzzy programming using the elevator kinematics optimisation (EKO) algorithm including its hybridisations of harmony search and bee algorithms. The comparisons are made for two different levels of inventory. It can be concluded that the EKO is slightly more effective than the other hybrid approaches in terms of quality of solutions. However, there is no difference in required computation time. The basic idea is to produce reliable solution in search space with the random external command in escaping from local trap during searching for a better solution. Numerical results demonstrate the robustness and effectiveness of the developed EKO method.
2018
7
4
22
427
An Elevator Kinematics Optimisation Method for Aggregate Production Planning Based on Fuzzy MOLP Model / Aungkulanon, Pasura; Luangpaiboon, Pongchanun; Montemanni, Roberto. - In: INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND ROBOTICS RESEARCH. - ISSN 2278-0149. - 7:4(2018), pp. 22-427. [10.18178/ijmerr.7.4.422-427]
Aungkulanon, Pasura; Luangpaiboon, Pongchanun; Montemanni, Roberto
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/1175990
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 15
  • ???jsp.display-item.citation.isi??? ND
social impact