LOCATELLI, MARCO

LOCATELLI, MARCO  

Dipartimento di Scienze e Metodi dell'Ingegneria  

Mostra records
Risultati 1 - 7 di 7 (tempo di esecuzione: 0.013 secondi).
Titolo Data di pubblicazione Autore(i) File
A GRASP for a real-world scheduling problem with unrelated parallel print machines and sequence-dependent setup times 1-gen-2023 Iori, M.; Locatelli, A.; Locatelli, M.
Mathematical models and heuristic algorithms for pallet building problems with practical constraints 1-gen-2021 Calzavara, G.; Iori, M.; Locatelli, M.; Moreira, M. C. O.; Silveira, T.
Reactive GRASP-Based Algorithm for Pallet Building Problem with Visibility and Contiguity Constraints 1-gen-2020 Iori, M.; Locatelli, M.; Moreira, M. C. O.; Silveira, T.
Scheduling of Parallel Print Machines with Sequence-Dependent Setup Costs: A Real-World Case Study 1-gen-2021 Iori, M.; Locatelli, A.; Locatelli, M.
Solution of a practical pallet building problem with visibility and contiguity constraints 1-gen-2020 Iori, M.; Locatelli, M.; Moreira, M. C. O.; Silveira, T.
Tool Switching Problems in the Context of Overlay Printing with Multiple Colours 1-gen-2022 Iori, M.; Locatelli, A.; Locatelli, M.; Salazar-Gonzalez, J. -J.
What is that 2?: Advertisements of follow-up formula and their perception by pregnant women and mothers in Italy 1-gen-2016 Cattaneo, A.; Pani, P.; Carletti, C.; Guidetti, M.; Mutti, V.; Guidetti, C.; Knowles, A.; Barbiero, C.; Montico, M.; Locatelli, M.; Conti, S.; Pellegrini, E.; Papa, O.; Nespoli, A.; Bettinelli, M. E.; De Gioia, C.; Lelli, M.; Mascheroni, R.; Cetin, I.; Pileri, P.; Gatti, R.; Pompilio, G.; Ortenzi, V.; Stronati, L.; Giusti, A.; Spadea, A.; Rinaldi, I.; Galluzzo, L.; Vadacca, P.; Sarta, S.; Nibali, S. C.; Crisafulli, R.; Nibali, R. C.; Corrado, F.; Garraffa, M.; Di Pasquale, M.; Gallo, M. C.