For ceramic tile manufacturers, warehouse management represents an extremely critical issue due to the necessity of storing pallets in an open yard by stacking them according to specific storage rules. In particular, pallets belonging to the same production batch must be stored in adjacent bins because customer orders must be collected from the same batch. Hence, a high fragmentation of the yard must be avoided. In order to free the bins that are to be assigned to the batches, shuffling operations must be performed before the batches are delivered by the production lines. In this paper, a shuffling algorithm is presented with the aim of designing a useful and flexible tool that may be integrated into a Warehouse Management System.

ON SHUFFLING OPERATIONS BEFORE THE STORAGE OF PRODUCTION BATCHES: AN ALGORITHM FOR CERAMIC TILE MANUFACTURERS / Gamberini, Rita; Consoli, D.; Lolli, Francesco; Rimini, Bianca. - ELETTRONICO. - (2013), pp. ---. (Intervento presentato al convegno 22nd ICPR - International Conference on Production Research - Challenges for sustainable operations tenutosi a Iguassu Falls (Brasil) nel 28th July - 1st August).

ON SHUFFLING OPERATIONS BEFORE THE STORAGE OF PRODUCTION BATCHES: AN ALGORITHM FOR CERAMIC TILE MANUFACTURERS

GAMBERINI, Rita;LOLLI, Francesco;RIMINI, Bianca
2013

Abstract

For ceramic tile manufacturers, warehouse management represents an extremely critical issue due to the necessity of storing pallets in an open yard by stacking them according to specific storage rules. In particular, pallets belonging to the same production batch must be stored in adjacent bins because customer orders must be collected from the same batch. Hence, a high fragmentation of the yard must be avoided. In order to free the bins that are to be assigned to the batches, shuffling operations must be performed before the batches are delivered by the production lines. In this paper, a shuffling algorithm is presented with the aim of designing a useful and flexible tool that may be integrated into a Warehouse Management System.
2013
22nd ICPR - International Conference on Production Research - Challenges for sustainable operations
Iguassu Falls (Brasil)
28th July - 1st August
-
-
Gamberini, Rita; Consoli, D.; Lolli, Francesco; Rimini, Bianca
ON SHUFFLING OPERATIONS BEFORE THE STORAGE OF PRODUCTION BATCHES: AN ALGORITHM FOR CERAMIC TILE MANUFACTURERS / Gamberini, Rita; Consoli, D.; Lolli, Francesco; Rimini, Bianca. - ELETTRONICO. - (2013), pp. ---. (Intervento presentato al convegno 22nd ICPR - International Conference on Production Research - Challenges for sustainable operations tenutosi a Iguassu Falls (Brasil) nel 28th July - 1st August).
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/975899
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? ND
social impact