The following paper deal with an approach to analyze a multi model manual assembly line for oleo dynamic products, and the following heuristic algorithm to optimize the scheduling of tasks to the available stations, under the respect of a set of restrictions, as task/station obligation, and with the aim of optimize a multi objective function based on time and line balancing costs elements. This problem can be considered as belonging to the wide area of GALB Problems. Some strategy about resource scheduling opportunities has been considered. The original system was an assembly line with six stations, and, in the original and referable configuration, with six operators, but, under the spur of residual margins of the utilization ratios, as a improving evolutive strategy, an idea of evaluate opportunities of improving performances, by assembling coupled mixed items, feeding together the assembly line, have been evaluated, based on a twin mirror counterflowed line.

Simulation models to support GALB heuristic algoritms and to evaluate multi objective performance index / Gallo, S. A.; Davoli, Giovanni; Govoni, Andrea; Melloni, Riccardo; Pattarozzi, GIAN LUCA. - STAMPA. - 1:(2012), pp. 414-427. (Intervento presentato al convegno Proceedings of the 24th European Modeling & Simulation Symposium 2012 tenutosi a Vienna Austria nel 19-21 September 2012).

Simulation models to support GALB heuristic algoritms and to evaluate multi objective performance index.

DAVOLI, Giovanni;GOVONI, Andrea;MELLONI, Riccardo;PATTAROZZI, GIAN LUCA
2012

Abstract

The following paper deal with an approach to analyze a multi model manual assembly line for oleo dynamic products, and the following heuristic algorithm to optimize the scheduling of tasks to the available stations, under the respect of a set of restrictions, as task/station obligation, and with the aim of optimize a multi objective function based on time and line balancing costs elements. This problem can be considered as belonging to the wide area of GALB Problems. Some strategy about resource scheduling opportunities has been considered. The original system was an assembly line with six stations, and, in the original and referable configuration, with six operators, but, under the spur of residual margins of the utilization ratios, as a improving evolutive strategy, an idea of evaluate opportunities of improving performances, by assembling coupled mixed items, feeding together the assembly line, have been evaluated, based on a twin mirror counterflowed line.
2012
Proceedings of the 24th European Modeling & Simulation Symposium 2012
Vienna Austria
19-21 September 2012
1
414
427
Gallo, S. A.; Davoli, Giovanni; Govoni, Andrea; Melloni, Riccardo; Pattarozzi, GIAN LUCA
Simulation models to support GALB heuristic algoritms and to evaluate multi objective performance index / Gallo, S. A.; Davoli, Giovanni; Govoni, Andrea; Melloni, Riccardo; Pattarozzi, GIAN LUCA. - STAMPA. - 1:(2012), pp. 414-427. (Intervento presentato al convegno Proceedings of the 24th European Modeling & Simulation Symposium 2012 tenutosi a Vienna Austria nel 19-21 September 2012).
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/964115
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 1
  • ???jsp.display-item.citation.isi??? ND
social impact