The increasing attention on global scheduling algorithms for identical multiprocessor platforms produced different, independently developed, schedulability tests. However, the existing relations among such tests have not been sufficiently clarified, so that it is difficult to understand which strategy provides the best performances in a particular scenario. In this paper, we will summarize the main existing results for the schedulability analysis of multiprocessor systems scheduled with global EDF, showing, when possible, existing dominance relations. We will compare these algorithms taking into consideration different aspects, namely, run-time complexity, average performances over a randomly generated workload, sustainability properties and speedup factors.

Evaluation of existing schedulability tests for global EDF / Bertogna, Marko. - STAMPA. - 0:(2009), pp. 11-18. (Intervento presentato al convegno 38th International Conference Parallel Processing Workshops, ICPPW 2009 tenutosi a Vienna, Austria nel September 22-25, 2009) [10.1109/ICPPW.2009.12].

Evaluation of existing schedulability tests for global EDF

BERTOGNA, Marko
2009

Abstract

The increasing attention on global scheduling algorithms for identical multiprocessor platforms produced different, independently developed, schedulability tests. However, the existing relations among such tests have not been sufficiently clarified, so that it is difficult to understand which strategy provides the best performances in a particular scenario. In this paper, we will summarize the main existing results for the schedulability analysis of multiprocessor systems scheduled with global EDF, showing, when possible, existing dominance relations. We will compare these algorithms taking into consideration different aspects, namely, run-time complexity, average performances over a randomly generated workload, sustainability properties and speedup factors.
2009
38th International Conference Parallel Processing Workshops, ICPPW 2009
Vienna, Austria
September 22-25, 2009
0
11
18
Bertogna, Marko
Evaluation of existing schedulability tests for global EDF / Bertogna, Marko. - STAMPA. - 0:(2009), pp. 11-18. (Intervento presentato al convegno 38th International Conference Parallel Processing Workshops, ICPPW 2009 tenutosi a Vienna, Austria nel September 22-25, 2009) [10.1109/ICPPW.2009.12].
File in questo prodotto:
File Dimensione Formato  
ICPP09.pdf

Accesso riservato

Tipologia: Versione dell'autore revisionata e accettata per la pubblicazione
Dimensione 377.6 kB
Formato Adobe PDF
377.6 kB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/701124
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 9
  • ???jsp.display-item.citation.isi??? 7
social impact