This study proposes a hybrid Golden Ball Algorithm for solving a balanced line production for a garment firm in Thailand. At present, production lines are those in which the timing of the job movement between stations is coordinated in such a way that all of the jobs are indexed simultaneously via some heuristic sequencing or dispatching rules. This research studies the balanced line production problem with some stochastic patterns, and develops a Golden Ball Algorithm or GBA and its variants to solve the problem. To assess the effectiveness of the proposed hybrid algorithm, a computational study is conducted for both deterministic and stochastic patterns of the problem. The comparisons are made for two different levels of processing times and due date. It can be concluded that the variant HGBA2 of the algorithm by adjusting answers of the successor function on both custom training and successor phases, is slightly more effective than the other hybrid approaches in terms of quality of solutions under uncertainty.

A Hybrid Meta heuristic Algorithm for the Balanced Line Production under Uncertainty / Aungkulanon, Pasura; Luangpaiboon, Pongchanun; Montemanni, Roberto. - 259:(2019). (Intervento presentato al convegno 6th International Conference on Traffic and Logistic Engineering (ICTLE 2018) tenutosi a Bangkok Thailand nel August 2018) [10.1051/matecconf/201925904003].

A Hybrid Meta heuristic Algorithm for the Balanced Line Production under Uncertainty

Montemanni Roberto
2019

Abstract

This study proposes a hybrid Golden Ball Algorithm for solving a balanced line production for a garment firm in Thailand. At present, production lines are those in which the timing of the job movement between stations is coordinated in such a way that all of the jobs are indexed simultaneously via some heuristic sequencing or dispatching rules. This research studies the balanced line production problem with some stochastic patterns, and develops a Golden Ball Algorithm or GBA and its variants to solve the problem. To assess the effectiveness of the proposed hybrid algorithm, a computational study is conducted for both deterministic and stochastic patterns of the problem. The comparisons are made for two different levels of processing times and due date. It can be concluded that the variant HGBA2 of the algorithm by adjusting answers of the successor function on both custom training and successor phases, is slightly more effective than the other hybrid approaches in terms of quality of solutions under uncertainty.
2019
6th International Conference on Traffic and Logistic Engineering (ICTLE 2018)
Bangkok Thailand
August 2018
259
Aungkulanon, Pasura; Luangpaiboon, Pongchanun; Montemanni, Roberto
A Hybrid Meta heuristic Algorithm for the Balanced Line Production under Uncertainty / Aungkulanon, Pasura; Luangpaiboon, Pongchanun; Montemanni, Roberto. - 259:(2019). (Intervento presentato al convegno 6th International Conference on Traffic and Logistic Engineering (ICTLE 2018) tenutosi a Bangkok Thailand nel August 2018) [10.1051/matecconf/201925904003].
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

Licenza Creative Commons
I metadati presenti in IRIS UNIMORE sono rilasciati con licenza Creative Commons CC0 1.0 Universal, mentre i file delle pubblicazioni sono rilasciati con licenza Attribuzione 4.0 Internazionale (CC BY 4.0), salvo diversa indicazione.
In caso di violazione di copyright, contattare Supporto Iris

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11380/1176460
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? 1
social impact