Sfoglia per Autore  

Opzioni
Mostrati risultati da 1 a 20 di 43
Titolo Data di pubblicazione Autore(i) File
ANALISI DI UN IMPIANTO PER IL RECUPERO DEI RAEE E VALUTAZIONE ECONOMICA DELLE ATTIVITÀ DI SUPPORTO 1-gen-2007 Gamberini, Rita; Gebennini, Elisa; Grassi, Andrea; Rimini, Bianca
MULTI-PERIOD LOCATION ALLOCATION PROBLEM WITH SAFETY STOCK OPTIMIZATION 1-gen-2007 Gebennini, Elisa; Gamberini, Rita; Manzini, R.; Mora, C.
RECUPERO DEI RAEE NELLA PROVINCIA DI REGGIO EMILIA - OTTIMIZZAZIONE DELLA RETE ESISTENTE SECONDO LA NORMATIVA ATTUALE MEDIANTE ANALISI SIMULATIVA 1-gen-2007 Gamberini, Rita; Gebennini, Elisa; Grassi, Andrea; Mora, C.; Rimini, Bianca
COMPLEX PACKAGING LINE MODELLING AND SIMULATION 1-gen-2007 Grassi, Andrea; Gebennini, Elisa; Goldoni, G.; Fantuzzi, Cesare; Gamberini, Rita; Nevin, R.; Rimini, Bianca
An analytical model for automated packaging lines design 1-gen-2008 Gebennini, Elisa; Grassi, Andrea; Secchi, Cristian; Fantuzzi, Cesare
A SIMULATION BASED APPROACH FOR SUPPORTING AUTOMATED GUIDED VEHICLES (AGVs) SYSTEMS DESIGN 1-gen-2008 Gebennini, Elisa; Dallari, S.; Grassi, Andrea; Perrica, G.; Fantuzzi, Cesare; Gamberini, Rita
AN INNOVATIVE MODEL FOR WEEE RECOVERY NETWORK MANAGEMENT IN ACCORDANCE WITH EU DIRECTIVES 1-gen-2008 Gamberini, Rita; Gebennini, Elisa; Grassi, Andrea; Mora, C.; Rimini, Bianca
On the introduction of a restart policy in the two-machine, one-buffer transfer line model 1-gen-2009 Gebennini, Elisa; Grassi, Andrea; Fantuzzi, Cesare; Gershwin, S. B.; Schick, I. C.
Simulation and analysis of a production line with multiple output formats 1-gen-2009 Grassi, Andrea; Perrica, Giuseppe; Gebennini, Elisa; Dallari, Sara; Fantuzzi, Cesare; Rimini, Bianca
Adoption of control policies in a simulative model for the design of AGV systems 1-gen-2009 Gebennini, Elisa; Dallari, Sara; Perrica, Giuseppe; Grassi, Andrea; Rimini, Bianca; Fantuzzi, Cesare
AN INTEGRATED PRODUCTION-DISTRIBUTION MODEL FOR THE DYNAMIC LOCATION AND ALLOCATION PROBLEM WITH SAFETY STOCK OPTIMIZATION 1-gen-2009 Gebennini, Elisa; Gamberini, Rita; Manzini, R.
A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem 1-gen-2009 Gamberini, Rita; Gebennini, Elisa; Grassi, Andrea; Regattieri, A.
Low cost automation and poka yoke devices: Tools for optimising production processes 1-gen-2009 Gamberini, Rita; Gebennini, Elisa; Rimini, Bianca; Spadaccini, E.; Zilocchi, D.
AN INNOVATIVE CONTAINER FOR WEEE COLLECTION AND TRANSPORT: DETAILS AND EFFECT FOLLOWING THE ADOPTION 1-gen-2009 Gamberini, Rita; Gebennini, Elisa; Rimini, Bianca
Costs and opportunities of centralizing/automating picking activities in supply chains 1-gen-2010 E., Depietri; Gebennini, Elisa; Grassi, Andrea; Rimini, Bianca; M., Pelliciari
A stochastic approach for the design of an end-of-line storage area 1-gen-2010 Dallari, Sara; Gebennini, Elisa; Grassi, Andrea; M., Johansson
ON THE INTEGRATION OF PLANNING AND ENVIRONMENTAL IMPACT ASSESSMENT FOR A WEEE TRANSPORTATION NETWORK – A CASE STUDY 1-gen-2010 Gamberini, Rita; Gebennini, Elisa; Manzini, R.; Ziveri, A.
A methodology for the design of simulation campaigns based on population variance characterization 1-gen-2010 Grassi, Andrea; Gebennini, Elisa; Perrica, Giuseppe; Fantuzzi, Cesare; Rimini, Bianca
ON THE INTRODUCTION OF A RESTART POLICY IN ANALYTICAL MODELS OF MANUFACTURING SERIAL LINES 1-gen-2011 Rimini, Bianca; Grassi, Andrea; Gamberini, Rita; Gebennini, Elisa
A building block for the decomposition analysis of production lines with restart policy 1-gen-2011 Gebennini, Elisa; Grassi, Andrea; Fantuzzi, Cesare
Mostrati risultati da 1 a 20 di 43
Legenda icone

  •  file ad accesso aperto
  •  file disponibili sulla rete interna
  •  file disponibili agli utenti autorizzati
  •  file disponibili solo agli amministratori
  •  file sotto embargo
  •  nessun file disponibile